Project: Century Automotive Call Center
Park Plaza 2, Albuq, NM

Project highlights:
120 Herman Miller AO2 Workstations – fully refurbished modular product. Remanufactured in Albuquerque Office Systems’ facility here in Albuquerque. Keeping many of the remanufacturing materials and all of the labor dollars here in NM. Utilized client’s existing modular product from Century Automotive’s other locations in Massachusetts, Arizona as well as their Albuquerque location to save them thousands of dollars in product for this project.  Electrical and IT requirements for the building remodel was based and installed specifically off of the furniture plan and layout provided by Albuquerque Office Systems’ many years of design and space planning experience. 

Additional Casegoods; desking, conference, and seating were provided to match existing casegoods furniture as well as use of materials to match or meet the client’s corporate color specifications. Fifteen offices of existing furniture and seating was incorporated from client’s Albuquerque location and moved by AOS to their new business location. Breakroom tables and training room tables were manufactured by AOS to match building materials and modular materials, respectively. Construction of the building remodel was under a strict time frame for completion and with weekly meetings throughout the construction timeline, contractors, painters, carpeting and furniture all came into place without a delay and client was moved in by the AOS crew, on schedule.

Century Automotive was fully operational upon their planned date of September 25th.

Demo Image
Overly

Century Automotive

Demo Image
Overly

Front Desk Area

Office seating coner table and chair
Overly

Office Table & Chairs

Demo Image
Overly

Office Stations

Demo Image
Overly

Office Stations

Demo Image
Overly

Office Stations

Break Room dining tables and chairs
Overly

Break Room

Training Room
Overly
Class back view
Overly

Menu